Improved pedestrian access to the waterfront was a key outcome of the masterplan consultations. With development proceeding at both Riverside and Seabraes the new bridge offers a direct alternative to journey between those areas, thus avoiding the 1.5km detour to avoid the railway.

The bridge also aligns with the recently constructed steps at Seabraes allowing for direct connection through the Seabraes development sites to the University Of Dundee campus. Footpath and Cycleway facilities also permit connections to Dundee City Centre and the popular west end residential district.

Dundee waterfront - Seabraes BridgeSeabraes Bridge Dundee

Dundee Waterfront Seabraes Bridge

Dundee Waterfront Seabraes Bridge

 

Construction Images

(03.06.15) Work continues on the access to the bridge in preparation for opening in mid-June 2015

Preparation work at Seabraes

(12.04.2015) Completed bridge deck is lowered into place

Seabraes Bridge Construction

Seabraes Bridge Construction

Seabraes Bridge Construction

(08.04.2015) Bridge assembly continues with glazing and deck surfacing being added

Seabraes Bridge Construction

(05.04.2015) Assembly of the bridge  almost complete with the support framework due to be moved into place over the Railway in mid April

Seabraes Bridge Under Construction

(01.03.2015) Work continues on assembling the bridge framework and access arrangements: